Minor Capital Improvement Projects

Some of our on-going minor projects under $600K.

Concord Boiler Replacement

Scope: Replace existing boiler with modified unit.

Status: Boilers installed. Controls undergoing programming/testing.

Data Center Relocation

Scope: Move telecom infrastructure from Warren Hall to Student Services Administration Building.

Status: Racks and electrical complete. Phone switch relocated. Need to install fire suppression system. Wiring being tested.

Health Center Soffit Repair

Scope: Repair collapsing soffit.

Status: Welding clips.

Laundry Room Conversion (Pioneer Heights)

Scope: Convert existing Lassen Hall fitness room to a laundry facility.

Status: Determining scope and costs.

Mass Alert System

Scope: Install a Mass Alert Notification system on the roof of Meiklejohn Hall.

Status: Acoustical engineer hired to determine placement.

New UU Office Renovation

Scope: Convert UE 2006 into two offices.

Status: Design Complete.

Parking Lot Lighting Retrofit

Scope: Improve lighting system in campus parking lots.

Status: Waiting for lighting fixtures to be delivered. FM to assemble fixtures.

PE 152 Computer Lab

Scope: Renovate Room 152 to accommodate additional computers. Provide ADA access.

Status: ADA ramp needs to be assembled.

Recreation and Wellness Center Sound System

Scope: Install sound system in Recreation and Wellness Center.

Status: Contractor installing system.

Roof Upgrades

Scope: Repair roof flashing in Meiklejohn Hall. Replace.

Status: Campus reviewing design.

Transformer Replacement

Scope: Replace transformer in Music Building.

Status: Bid opening scheduled for February 7, 2012.

Recently Completed Projects

12KV Upgrade - Phase III

Scope: Upgrading electrical conduit throughout the Hayward campus.

Completed: December 2011

Health Center Audio

Scope: Includes Panic Buttons for each of the exam rooms and an improved audio system.

Completed: December 2011

Phase I Pioneer Heights Renovation

Scope: Remodel Room 152 to accommodate additional computers. Provide ADA access.

Completed: Summer 2011

Restroom Renovations

Scope: Update bathrooms throughout campus. Includes new tiling and flooring.

Completed: December 2011

Security Cameras

Scope: Place security cameras on the Student Services & Administration building covering the east parking lots.

Completed: December 2011